Projects — TIB Project Information
TIB Project Information
City of White Salmon's NW Garfield Avenue
6-E-936(008)-1
6-E-936(008)-1
NW Garfield Avenue
W Jewett Blvd (SR 141) to NW Washington St
FY 2021 Small City Arterial Program
Current Phase : Design
Total TIB Funding : $262,873
County: Klickitat | Legislative District: 14 | Project Length: 0.03 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | WHITE SALMON |
Funding Year | 2021 |
Program | SCAP |
Current Phase | Design |
Legislative District | 14 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.03 mi. |
ADT | 500 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Pat Munyan |
Contact Email | patm@ci.white-salmon.wa.us |
TIB Engineer | Chris Langhoff |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2019 | |
Delayed Project Date | 07/01/2022 | |
Predesign Approval | ||
Design Approval | 02/01/2020 | 12/23/2019 |
Bid Auth. Approval | 03/22/2023 | |
Construction Approval | 04/30/2023 | |
Project Closeout | 10/30/2023 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 30,331 | 33,701 |
Right of Way | 0 | 0 |
Total Design | 30,331 | 33,701 |
Construction Engineering | 30,331 | 33,701 |
Construction Contract | 202,211 | 224,679 |
Other Construction | 0 | 0 |
Total Construction | 232,542 | 258,380 |
Total TIB Funding | 262,873 | 292,081 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WHITE SALMON | 29,208 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 29,208 | 10.0% |
Project Description
The roadway will be excavated and a road base will be installed between W. Jewett Blvd. and NW Washington St. Most of the road failure is due to lack of road base. A sidewalk will be installed along the east side connecting it to the sidewalk on Lincoln Street and W. Jewett Blvd. The Lincoln Street Project was completed 2 years ago.
Existing Condition
Project Benefits
- Improves pedestrian safety;
- Improves arterial network;
- Extends improvements;
- Removes ADA barriers
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |