Byars Street serves as a direct route from Mill Street to North Columbus Avenue. The Klickitat County Fairgrounds and the towns only hardware store are located on Mill Street. This is the primary route for residents north of town to access these facilities. Intersections at Byars and High and Byars and Mill have line of sight limitations
Projects — TIB Project Information
TIB Project Information
City of Goldendale's W Byars Street
6-E-935(009)-1
6-E-935(009)-1
W Byars Street
Mill St to Columbus Ave
FY 2022 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $716,569
County: Klickitat | Legislative District: 14 | Project Length: 0.37 | TIB Engineer: Jonathan Heusman | Last Payment Date: 01/11/2023
Project Information
Lead Agency | GOLDENDALE |
Funding Year | 2022 |
Program | SCAP |
Current Phase | Construction |
Legislative District | 14 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.37 mi. |
ADT | 500 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Larry Bellamy |
Contact Email | lbellamy@ci.goldendale.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 01/11/2023 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/20/2020 | |
Delayed Project Date | 07/01/2023 | |
Predesign Approval | ||
Design Approval | 02/01/2021 | 12/08/2020 |
Bid Auth. Approval | 03/30/2022 | 03/14/2022 |
Construction Approval | 04/30/2022 | 04/08/2022 |
Project Closeout | 02/28/2023 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 51,381 | 55,000 |
Right of Way | 0 | 0 |
Total Design | 51,381 | 55,000 |
Construction Engineering | 51,381 | 80,695 |
Construction Contract | 513,807 | 717,552 |
Other Construction | 0 | 0 |
Total Construction | 565,188 | 798,247 |
Funding Increase | 100,000 | |
Total TIB Funding | 716,569 | 853,247 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
GOLDENDALE | 136,678 | 16.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 136,678 | 10.0% |
Project Description
The roadway will be excavated with a portion of the excavation used to fill the south edge of the roadway./ The ditch on the north side will be filled and drain pipe installed to keep the ditch dry and therby keeping the roadway dry. Most of the road failure is on the north side of the road from this drainage issue. Line of sight will be improved for the interesections by excavating and installing a retaining wall in this area.
Existing Condition
Project Benefits
- Improves safety;
- Restores structural condition
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |