City of Dayton's N 3rd Street

6-E-924(007)-1

6-E-924(007)-1
N 3rd Street

Main St to Dayton Ave

FY 2023 Small City Arterial Program
Current Phase : Bid Authorization
Total TIB Funding : $1,177,890

County: Columbia   |   Legislative District: 16   |   Project Length: 0.31   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 02/08/2023

Project Information

Lead Agency DAYTON
Funding Year 2023
Program SCAP
Current Phase Bid Authorization
Legislative District 16
Congressional District 5
Federal Route Number 9999
Project Length 0.31 mi.
ADT 500
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact Zac Weatherford
Contact Email ZWeatherford@daytonwa.com
TIB Engineer Jonathan Heusman
Last Payment Date 02/08/2023

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2024  
Predesign Approval
Design Approval 02/28/2022 01/27/2022
Bid Auth. Approval 02/28/2023 03/13/2023
Construction Approval 03/31/2023
Project Closeout 12/31/2023
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 123,500 130,000
Right of Way 0 0
Total Design 123,500 130,000
     
Construction Engineering 114,000 120,000
Construction Contract 940,390 989,885
Other Construction 0 0
Total Construction 1,054,390 1,109,885
     
Total TIB Funding 1,177,890 1,239,885

Local Funding Partners

Funding Amount Percent
DAYTON 61,995 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 61,995 5.0%

Project Description

Reconstruct N 3rd Street from Dayton Ave to Main St with full depth reclamation and cement-treated base. Reduce the pavement section through a road diet between Commercial St and Patit Ave Replace the existing curb, gutter, and sidewalk and install new pedestrian ramps from Dayton Ave to Main St. Improve the railroad crossing to meet ADA requirements.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments