Cascade Dr. has a poor/non-existent road base in areas. Roadway contains alligator cracking and potholes throughout entire length as well as deterioration of the entire roadway. If roadway is not repaired soon the Town will be unable to preserve and extend the life of the existing roadway as it currently exhibits extensive failure and is deteriorating away. Roadway is subject to primarily truck traffic daily from local industries and needs to be restored before complete failure and it cannot be.
Projects — TIB Project Information
TIB Project Information
Town of Twisp's Cascade Drive
6-E-886(009)-1
6-E-886(009)-1
Cascade Drive
Airport Dr to Airport Dr
FY 2023 Small City Arterial Program
Current Phase : Construction
Total TIB Funding : $270,625
County: Okanogan | Legislative District: 12 | Project Length: 0.24 | TIB Engineer: Andrew Beagle | Last Payment Date: 10/25/2022
Project Information
Lead Agency | TWISP |
Funding Year | 2023 |
Program | SCAP |
Current Phase | Construction |
Legislative District | 12 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.24 mi. |
ADT | 200 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Andrew Denham |
Contact Email | publicworks@townoftwisp.com |
TIB Engineer | Andrew Beagle |
Last Payment Date | 10/25/2022 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
Predesign Approval | ||
Design Approval | 02/01/2022 | 02/23/2022 |
Bid Auth. Approval | 05/15/2022 | 04/28/2022 |
Construction Approval | 06/01/2022 | 06/07/2022 |
Project Closeout | 03/01/2023 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 24,646 | 23,924 |
Right of Way | 0 | 0 |
Total Design | 24,646 | 23,924 |
Construction Engineering | 24,645 | 20,981 |
Construction Contract | 246,460 | 225,720 |
Other Construction | 0 | 0 |
Total Construction | 271,105 | 246,701 |
Funding Surplus | - 25,126 | |
Total TIB Funding | 270,625 | 270,625 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
TWISP | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Project proposes a grind and 3 inch overlay of existing roadway including subgrade repairs in problem areas to provide a continuous solid base for the roadway to handle the heavy industrial traffic and loads it sees daily.
Existing Condition
Project Benefits
- Restores structural condition
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |