5th Ave to 3rd Ave

FY 2021 Small City Arterial Program
Current Phase : Audit
Total TIB Funding : $343,039

County: Okanogan   |   Legislative District: 7   |   Project Length: 0.10   |   TIB Engineer: Andrew Beagle   |   Last Payment Date: 02/14/2023

Project Information

Lead Agency OKANOGAN
Funding Year 2021
Program SCAP
Current Phase Audit
Legislative District 7
Congressional District 4
Federal Route Number 9999
Project Length 0.10 mi.
ADT 170
Functional Class TIB Arterial
Type of Work Reconstruction
Project Contact Shawn Davisson
Contact Email publicworks@okanogancity.com
TIB Engineer Andrew Beagle
Last Payment Date 02/14/2023
Cultural Resource Assessment CRA

Project Schedule

  Target Date Actual Date
Project Selection Date   11/22/2019
Delayed Project Date 07/01/2022  
DAHP Assessment Date   01/24/2020
Predesign Approval
Design Approval 02/01/2020 01/22/2020
Bid Auth. Approval 02/01/2022 01/08/2021
Construction Approval 03/01/2022 02/17/2022
Project Closeout 12/31/2022 02/07/2023
Audit Date   02/14/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 40,050 37,000
Right of Way 0 0
Total Design 40,050 37,000
     
Construction Engineering 40,050 51,000
Construction Contract 267,300 293,155
Other Construction 0 0
Total Construction 307,350 344,155
     
Funding Surplus - 4,361  
Total TIB Funding 343,039 381,155

Local Funding Partners

Funding Amount Percent
OKANOGAN 38,116 10.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 38,116 10.0%

Project Description

The project reconstructs the street and realigns the one-way section to improve safety on the corridor. Based on recent projects on 5th Avenue and Upper Pine Street, it is likely shallow cobbles are present. Full depth reclamation is not feasible. Adding sidewalk between 3rd Avenue and 5th Avenue eliminates the gap and provides a continuous pedestrian route to Okanogan High School and Middle School. Installation of curbing better directs traffic to prevent vehicles from entering the wrong way between 3rd Avenue and 4th Avenue. Storm drainage structures collect and convey stormwater preventing damage to the roadway and flooding of the downstream central business district.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments