City of Shelton's FY 2020 Overlay Project

3-W-194(004)-1

3-W-194(004)-1
FY 2020 Overlay Project

Multiple Locations

FY 2020 Arterial Preservation Program
Current Phase : Audit
Total TIB Funding : $390,390

County: Mason   |   Legislative District: 35   |   Project Length: 0.47   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 08/14/2023

Project Information

Lead Agency SHELTON
Funding Year 2020
Program APP
Current Phase Audit
Legislative District 35
Congressional District 10
Federal Route Number 5460
Project Length 0.47 mi.
ADT 6,348
Functional Class Collector
Type of Work Resurfacing
Project Contact Craig Gregory
Contact Email craig@ci.shelton.wa.us
TIB Engineer Chris Langhoff
Last Payment Date 08/14/2023
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2018
Delayed Project Date 07/01/2021  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/01/2019 12/26/2018
Bid Auth. Approval 02/01/2022 01/28/2022
Construction Approval 04/01/2022 03/11/2022
Project Closeout 07/31/2023 08/02/2023
Audit Date   08/14/2023
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 34,200 44,633
Right of Way 0 0
Total Design 34,200 44,633
     
Construction Engineering 34,200 62,784
Construction Contract 342,000 400,225
Other Construction 0 0
Total Construction 376,200 463,009
     
Funding Surplus - 20,010  
Total TIB Funding 390,390 507,642

Local Funding Partners

Funding Amount Percent
SHELTON 117,252 23.1%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 117,252 23.1%

Project Description

This project will include the grinding and overlaying of Railroad Avenue from 12th St. to the City limits 100'+/- beyond Pacific Ct. Crushed surfacing top course will be used to fill and level the areas adjacent to the traveled way. Non-compliant ADA curb ramps and sidewalk replacement funds are being requested through the 2018 Urban SP for the same project area. Currently, the City has three other planned construction projects that include the placement of estimated an 10,500 tons of HMA. The City will be replacing the watermain in early 2019 prior to the HMA overlay.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.