 Projects — TIB Project Information

TIB Project Information

City of Washougal's 2024 Main Street Overlay

3-W-186(002)-1

3-W-186(002)-1
2024 Main Street Overlay

Multiple Locations

FY 2025 Arterial Preservation Program
Current Phase : Construction
Total TIB Funding : $722,690

County: Clark   |   Legislative District: 17   |   Project Length: 0.56   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 10/14/2024

Project Information

Lead Agency WASHOUGAL
Funding Year 2025
Program APP
Current Phase Construction
Legislative District 17
Congressional District 3
Federal Route Number 7050
Project Length 0.56 mi.
ADT 0
Functional Class Minor
Type of Work Resurfacing
Project Contact Scott Collins
Contact Email Scott.Collins@cityofwashougal.us
TIB Engineer Chris Langhoff
Last Payment Date 10/14/2024
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/01/2024 12/12/2023
Bid Auth. Approval 06/28/2024 06/24/2024
Construction Approval 07/31/2024 08/08/2024
Project Closeout 12/15/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 105,400 119,429
Right of Way 0 0
Total Design 105,400 119,429
     
Construction Engineering 20,825 15,278
Construction Contract 502,201 832,875
Other Construction 0 0
Total Construction 523,026 848,153
     
Funding Increase 94,264  
Total TIB Funding 722,690 967,582

Local Funding Partners

Funding Amount Percent
WASHOUGAL 244,892 25.3%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 244,892 25.3%

Project Description

2 inch grind and overlay

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments