City of Port Angeles's 2024 Marine Drive Overlay

3-W-150(003)-1

3-W-150(003)-1
2024 Marine Drive Overlay

Tumwater Truck Route to Hill Street

FY 2025 Arterial Preservation Program
Current Phase : Audit
Total TIB Funding : $492,424

County: Clallam   |   Legislative District: 24   |   Project Length: 0.97   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 11/14/2024

Project Information

Lead Agency PORT ANGELES
Funding Year 2025
Program APP
Current Phase Audit
Legislative District 24
Congressional District 6
Federal Route Number 7574
Project Length 0.97 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Jonathan Boehme
Contact Email jboehme@cityofpa.us
TIB Engineer Chris Langhoff
Last Payment Date 11/14/2024
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/15/2024 01/04/2024
Bid Auth. Approval 02/29/2024 02/22/2024
Construction Approval 04/30/2024 03/25/2024
Project Closeout 11/30/2024 11/12/2024
Audit Date   11/14/2024
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 30,839 11,098
Right of Way 0 0
Total Design 30,839 11,098
     
Construction Engineering 30,839 45,104
Construction Contract 678,470 725,373
Other Construction 0 0
Total Construction 709,309 770,477
     
Funding Surplus - 247,724  
Total TIB Funding 492,424 781,576

Local Funding Partners

Funding Amount Percent
PORT ANGELES 289,151 37.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 289,151 37.0%

Project Description

2 inch grind and overlay

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments