City of Duvall's 2022 Overlay Award
3-P-802(005)-1
3-P-802(005)-1
2022 Overlay Award
Multiple Locations
FY 2024 Arterial Preservation Program
Current Phase : Audit
Total TIB Funding : $363,267
County: King | Legislative District: 45 | Project Length: 0.48 | TIB Engineer: Greg Armstrong | Last Payment Date: 10/16/2023
Project Information
Lead Agency | DUVALL |
Funding Year | 2024 |
Program | APP |
Current Phase | Audit |
Legislative District | 45 |
Congressional District | 1 |
Federal Route Number | 2280 |
Project Length | 0.48 mi. |
ADT | 0 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Benjamin Ressler |
Contact Email | benjamin.ressler@duvallwa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | 10/16/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 01/01/2024 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 01/04/2023 |
Bid Auth. Approval | 05/15/2023 | 05/10/2023 |
Construction Approval | 05/31/2023 | 05/31/2023 |
Project Closeout | 09/30/2023 | 10/02/2023 |
Audit Date | 10/16/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 2,326 |
Construction Contract | 399,500 | 439,047 |
Other Construction | 0 | 0 |
Total Construction | 399,500 | 441,373 |
Funding Increase | 1,833 | |
Funding Surplus | - 38,066 | |
Total TIB Funding | 363,267 | 441,373 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
DUVALL | 78,106 | 17.7% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 78,106 | 17.7% |
Project Description
This project grinds, patches and provides a 2 inch overlay, striping and ADA curb ramp retrofits of the follow segments Cherry Valley Road - SR 203 to C/L - 2 ADA Ramps Big Rock Road - SR 203 to Pavt Change - 4 ADA Ramps
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |