TIB Project Information

City of Snohomish's FY 2022 Overlay Project

3-P-142(007)-1

3-P-142(007)-1
FY 2022 Overlay Project

Multiple Locations

FY 2022 Arterial Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Snohomish   |   Legislative District: 44   |   Project Length: 0.35   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency SNOHOMISH
Funding Year 2022
Program APP
Current Phase Withdrawn
Legislative District 44
Congressional District 1
Federal Route Number 2644
Project Length 0.35 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Andrew Sics
Contact Email sics@snohomishwa.gov
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/20/2020
Delayed Project Date 07/01/2023  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2021 12/07/2020
Bid Auth. Approval 04/01/2021
Construction Approval 05/01/2021
Project Closeout 10/31/2021
Audit Date  
Withdrawn Date   01/21/2021

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
SNOHOMISH 63,885 15.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 63,885 15.0%

Project Description

This project grinds and provides a 2-inch overlay of the following segments 4th Street - Avenue E to Avenue J Avenue D - McDonalds N Property Line to 10th Street The city will upgrade ADA ramps at their own expense prior to paving.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.