Multiple Locations

FY 2025 Arterial Preservation Program
Current Phase : Audit
Total TIB Funding : $563,250

County: Pierce   |   Legislative District: 28   |   Project Length: 0.49   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 08/15/2025

Project Information

Lead Agency FIRCREST
Funding Year 2025
Program APP
Current Phase Audit
Legislative District 28
Congressional District 10
Federal Route Number 3220
Project Length 0.49 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Tyler Bemis
Contact Email tbemis@cityoffircrest.net
TIB Engineer Greg Armstrong
Last Payment Date 08/15/2025
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 03/13/2024 03/19/2024
Bid Auth. Approval 03/07/2025 03/03/2025
Construction Approval 04/01/2025 04/02/2025
Project Closeout 10/31/2025 08/14/2025
Audit Date   08/15/2025
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 97,434 115,266
Right of Way 0 0
Total Design 97,434 115,266
     
Construction Engineering 62,140 56,252
Construction Contract 517,835 509,728
Other Construction 0 0
Total Construction 579,975 565,980
     
Funding Surplus - 114,159  
Total TIB Funding 563,250 681,246

Local Funding Partners

Funding Amount Percent
FIRCREST 117,996 17.3%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 117,996 17.3%

Project Description

Grind and 2-inch overlay of Claremont Street - Alameda Ave and 67th Ave W with 8 ADA ramps.