Pavement due for resurfacing, road diet possibilities.
Projects — TIB Project Information
TIB Project Information
City of Ephrata's Nat Washington Way Overlay
3-E-164(007)-2
3-E-164(007)-2
Nat Washington Way Overlay
A Street SE to 2nd Ave SE
FY 2024 Arterial Preservation Program
Current Phase : Construction
Total TIB Funding : $30,807
County: Grant | Legislative District: 13 | Project Length: 1.32 | TIB Engineer: Andrew Beagle | Last Payment Date:
Project Information
Lead Agency | EPHRATA |
Funding Year | 2024 |
Program | APP |
Current Phase | Construction |
Legislative District | 13 |
Congressional District | 0 |
Federal Route Number | 6480 |
Project Length | 1.32 mi. |
ADT | 0 |
Functional Class | Minor |
Type of Work | Resurfacing |
Project Contact | Shawn O'Brien |
Contact Email | sobrien@ephrata.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2023 | 01/03/2022 |
Bid Auth. Approval | 09/20/2024 | 09/20/2024 |
Construction Approval | 09/20/2024 | 09/20/2024 |
Project Closeout | 11/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 4,500 | 5,000 |
Construction Contract | 26,307 | 29,320 |
Other Construction | 0 | 0 |
Total Construction | 30,807 | 34,320 |
Total TIB Funding | 30,807 | 34,320 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
EPHRATA | 3,513 | 10.2% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 3,513 | 10.2% |
Project Description
Digouts, crack sealing where needed. Staged project - this stage is prep work prior to chip seal. Nat Washington Way - A St SE to SR-282
Existing Condition
Project Benefits
- Preservation of the roadway, possible mulitmodal benefit.
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |