City of Stevenson's 2022 Seal Coat Award

2-W-974(002)-1

2-W-974(002)-1
2022 Seal Coat Award

Multiple Locations

FY 2024 Small City Preservation Program
Current Phase : Bid Authorization
Total TIB Funding : $144,907

County: Skamania   |   Legislative District: 14   |   Project Length: 1.97   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency STEVENSON
Funding Year 2024
Program SCPP
Current Phase Bid Authorization
Legislative District 14
Congressional District 3
Federal Route Number 9999
Project Length 1.97 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Carolyn Sourek
Contact Email carolyn@ci.stevenson.wa.us
TIB Engineer Chris Langhoff
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/02/2022
Delayed Project Date 01/01/2024  
DAHP Assessment Date  
Predesign Approval
Design Approval 02/01/2023 01/30/2023
Bid Auth. Approval 04/15/2023 01/30/2023
Construction Approval 05/01/2023 01/30/2023
Project Closeout 12/31/2024
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 144,907 152,534
Other Construction 0 0
Total Construction 144,907 152,534
     
Total TIB Funding 144,907 152,534

Local Funding Partners

Funding Amount Percent
STEVENSON 7,627 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 7,627 5.0%

Project Description

Chip Seal of the following segments Frank John Road - Loop Rd to C/L Gale Street - Frank John Rd to End Hemingway Street - Lutheran Church Rd to Lower Basso Cir Vista Drive - Loop Rd to Rnd Montell Terrace - Loop Rd to End Jordan Road - Frank John Rd to End Ridgecrest Drive - W End to E End Lutheran Church Road - SR 14 to End Lower Basso Circle - Lutheran Church Rd to End Wisteria Way - Bone Rd to End Lucas Street - Loop Rd to End Thomas Street - Frank John Rd to Loop Rd

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments