There are numerous streets within the Town that have experienced cracking that need to be crack sealed to extend the life of the pavement.
Projects — TIB Project Information
TIB Project Information
Town of Friday Harbor's 2024 Street Maintenance
2-W-831(008)-1
2-W-831(008)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $99,324
County: San Juan | Legislative District: 40 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | FRIDAY HARBOR |
Funding Year | 2025 |
Program | SCPP |
Current Phase | Construction |
Legislative District | 40 |
Congressional District | 2 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Jesse DouglasSeitz |
Contact Email | jesseds@fridayharbor.org |
TIB Engineer | Chris Langhoff |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2024 | 01/04/2024 |
Bid Auth. Approval | 08/15/2024 | 08/28/2024 |
Construction Approval | 09/15/2024 | 09/05/2024 |
Project Closeout | 10/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 99,324 | 110,360 |
Other Construction | 0 | 0 |
Total Construction | 99,324 | 110,360 |
Total TIB Funding | 99,324 | 110,360 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
FRIDAY HARBOR | 11,036 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 11,036 | 10.0% |
Project Description
These various cracks will be cleaned and sealed.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |