Town of South Prairie's 2024 Maintenance Project

2-P-815(005)-1

2-P-815(005)-1
2024 Maintenance Project

Citywide Crack Seal

FY 2025 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $3,130

County: Pierce   |   Legislative District: 31   |   Project Length: 0.20   |   TIB Engineer: Greg Armstrong   |   Last Payment Date:

Project Information

Lead Agency SOUTH PRAIRIE
Funding Year 2025
Program SCPP
Current Phase Design
Legislative District 31
Congressional District 8
Federal Route Number 9999
Project Length 0.20 mi.
ADT 250
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Michael Horton
Contact Email MHorton@kleinfelder.com
TIB Engineer Greg Armstrong
Last Payment Date
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   12/01/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 01/01/2024 12/19/2023
Bid Auth. Approval 02/05/2025
Construction Approval 02/28/2025
Project Closeout 08/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 3,130 3,130
Other Construction 0 0
Total Construction 3,130 3,130
     
Total TIB Funding 3,130 3,130

Local Funding Partners

Funding Amount Percent
SOUTH PRAIRIE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Crack sealing Second Street-between Emery and Cascade 7 between Rainier and Union Hill (gravel pile) 29. Third Street-between SP Carbon River Road and Eleanor 98.5 between Eleanor and Tacoma 76 between Tacoma and Emery 38 between Emery and Carriage 225 between Carriage and Gravel Pile 104.8. Emery-between Franklin and Washington 520.8 between Washington and SR 162 528.9 between SR 162 and First 170 between Second and Third 135. Rainier-between SR 162 and Second 263.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.