Town of South Prairie's 2024 Otta Seal

2-P-815(004)-1

2-P-815(004)-1
2024 Otta Seal

Multiple Locations

FY 2024 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $145,000

County: Pierce   |   Legislative District: 31   |   Project Length: 0.78   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 06/26/2024

Project Information

Lead Agency SOUTH PRAIRIE
Funding Year 2024
Program SCPP
Current Phase Design
Legislative District 31
Congressional District 8
Federal Route Number 9999
Project Length 0.78 mi.
ADT 0
Functional Class Local Access
Type of Work Resurfacing
Project Contact Terri Berry
Contact Email clerk@townofsp.com
TIB Engineer Greg Armstrong
Last Payment Date 06/26/2024
Cultural Resource Assessment Not Required

Project Schedule

  Target Date Actual Date
Project Selection Date   11/08/2023
Delayed Project Date 07/01/2026  
DAHP Assessment Date  
Predesign Approval
Design Approval 11/15/2023 11/13/2023
Bid Auth. Approval 02/05/2025
Construction Approval 02/28/2025
Project Closeout 08/31/2025
Audit Date  
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 21,268 21,268
Right of Way 0 0
Total Design 21,268 21,268
     
Construction Engineering 15,345 15,345
Construction Contract 108,387 108,387
Other Construction 0 0
Total Construction 123,732 123,732
     
Total TIB Funding 145,000 145,000

Local Funding Partners

Funding Amount Percent
SOUTH PRAIRIE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Gravel Street Conversation Carriage Road - SE 3rd St to end 2,345 feet SE 1st Street - Emery St to Cascade St 275 feet Cascade Street - SE 1st St to SE 2nd St 275 feet 3rd Street - Tubbs Rd to end 750 feet Franklin Street - Emery St to end 300 feet Union Hill - Tubbs Rd to SE 3rd St 170 feet 2nd Street W - Elenor St to EOR 210 feet

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.