The pavement condition on the 104-105th arterial through Beaux Arts has deteriorated significantly in recent years. Large areas of alligatored pavement have developed. These areas are showing signs of poor base condition including silt migrating up through the cracks and deflection in the road surface. Potholes have developed in a couple of areas and these have required repeated patching. The road is a King County Metro bus route and the bus loads have contributed to the deterioration.
Projects — TIB Project Information
TIB Project Information
Town of Beaux Arts's 104th105th Pavement Preservation
2-P-123(001)-1
2-P-123(001)-1
104th105th Pavement Preservation
North Town limit to SE 30th
FY 2026 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $195,271
County: King | Legislative District: 41 | Project Length: 1.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | BEAUX ARTS VILLAGE |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Construction |
Legislative District | 41 |
Congressional District | 9 |
Federal Route Number | 9999 |
Project Length | 1.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Brad Wheeler |
Contact Email | bwheeler@beauxarts-wa.gov |
TIB Engineer | Greg Armstrong |
Last Payment Date | |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 08/08/2024 | |
Delayed Project Date | 07/01/2027 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 08/15/2024 | 08/12/2024 |
Bid Auth. Approval | 08/15/2024 | 08/12/2024 |
Construction Approval | 08/15/2024 | 08/12/2024 |
Project Closeout | 06/30/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 195,271 | 205,548 |
Other Construction | 0 | 0 |
Total Construction | 195,271 | 205,548 |
Total TIB Funding | 195,271 | 205,548 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
BEAUX ARTS VILLAGE | 10,277 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 10,277 | 5.0% |
Project Description
The alligatored sections of pavement will be removed and replaced with a heavier road section including a crushed surfacing base layer and two lifts of HMA pavement patch.
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |