Mutiple Segments on different roads in the city of Asotin have begun to form extensive cracks in the road surface.
Projects — TIB Project Information
TIB Project Information
City of Asotin's 2024 Street Maintenance
2-E-921(003)-1
2-E-921(003)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $89,779
County: Asotin | Legislative District: 9 | Project Length: 0.00 | TIB Engineer: Jonathan Heusman | Last Payment Date: 12/02/2024
Project Information
| Lead Agency | ASOTIN |
| Funding Year | 2025 |
| Program | SCPP |
| Current Phase | Audit |
| Legislative District | 9 |
| Congressional District | 5 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | Bob Portlock |
| Contact Email | asotinpublicworks@cityofastoin.org |
| TIB Engineer | Jonathan Heusman |
| Last Payment Date | 12/02/2024 |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 12/01/2023 | |
| Delayed Project Date | 07/01/2026 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2024 | 01/25/2024 |
| Bid Auth. Approval | 05/15/2024 | 01/25/2024 |
| Construction Approval | 06/01/2024 | 06/10/2024 |
| Project Closeout | 12/31/2024 | 11/26/2024 |
| Audit Date | 12/02/2024 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 56,525 | 94,505 |
| Other Construction | 0 | 0 |
| Total Construction | 56,525 | 94,505 |
| Funding Increase | 33,254 | |
| Total TIB Funding | 89,779 | 94,505 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| ASOTIN | 4,726 | 5.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 4,726 | 5.0% |
Project Description
Clean out the existing cracks and seal them.
Existing Condition
Project Benefits
- Intent for County to do the work.
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||
