City is in need of maintaining existing roadway system. Most roads have decent base but the pavement is deteriorating.
Projects — TIB Project Information
TIB Project Information
City of Chewelah's 2024 Street Maintenance
2-E-901(005)-1
2-E-901(005)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $54,587
County: Stevens | Legislative District: 7 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 10/10/2024
Project Information
Lead Agency | CHEWELAH |
Funding Year | 2025 |
Program | SCPP |
Current Phase | Construction |
Legislative District | 7 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Jim Caruso |
Contact Email | cadmin@cityofchewelah.org |
TIB Engineer | Andrew Beagle |
Last Payment Date | 10/10/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2024 | 03/19/2024 |
Bid Auth. Approval | 03/01/2024 | 03/19/2024 |
Construction Approval | 03/18/2024 | 05/30/2024 |
Project Closeout | 08/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 54,587 | 57,460 |
Other Construction | 0 | 0 |
Total Construction | 54,587 | 57,460 |
Total TIB Funding | 54,587 | 57,460 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CHEWELAH | 2,873 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 2,873 | 5.0% |
Project Description
City performed repair areas and crack sealing.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |