Current Phase : Audit
Total TIB Funding : $94,048
County: Spokane | Legislative District: 9 | Project Length: 0.33 | TIB Engineer: Andrew Beagle | Last Payment Date: 01/17/2023
Project Information
Lead Agency | SPANGLE |
Funding Year | 2023 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 0.33 mi. |
ADT | 0 |
Functional Class | Local Access |
Type of Work | Resurfacing |
Project Contact | Peggy Mangis |
Contact Email | townofspangle@centurytel.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 01/17/2023 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 06/10/2022 | |
Delayed Project Date | 07/01/2024 | |
DAHP Assessment Date | ||
Predesign Approval | 05/01/2022 | |
Design Approval | 06/30/2022 | 06/16/2022 |
Bid Auth. Approval | 06/30/2022 | 07/06/2022 |
Construction Approval | 06/30/2022 | 07/06/2022 |
Project Closeout | 10/31/2022 | 01/13/2023 |
Audit Date | 01/17/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 10,702 | 0 |
Construction Contract | 78,458 | 0 |
Other Construction | 0 | 94,048 |
Total Construction | 89,160 | 94,048 |
Funding Increase | 4,888 | |
Total TIB Funding | 94,048 | 94,048 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SPANGLE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Spokane County will conduct a 1.5' overlay on multiple segments throughout the town of Spangle. N Spangle Ave E 1st St to E 3rd St N Spangle Ave E 5th St to E 6th St E 6th St N Pine St to N Spangle Ave E 7th St N Pine St to N Spangle Ave
Existing Condition
Project Benefits
Project Pictures
No images available.
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |