Alligatoring and cracking on town streets.
Projects — TIB Project Information
TIB Project Information
Town of Fairfield's 2024 Street Maintenance
2-E-895(005)-1
2-E-895(005)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $40,251
County: Spokane | Legislative District: 9 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 02/26/2025
Project Information
| Lead Agency | FAIRFIELD |
| Funding Year | 2025 |
| Program | SCPP |
| Current Phase | Audit |
| Legislative District | 9 |
| Congressional District | 5 |
| Federal Route Number | 9999 |
| Project Length | 0.00 mi. |
| ADT | 0 |
| Functional Class | TIB Arterial |
| Type of Work | Resurfacing |
| Project Contact | Cheryl Loeffler |
| Contact Email | townclerk@fairfieldwa.com |
| TIB Engineer | Andrew Beagle |
| Last Payment Date | 02/26/2025 |
| Cultural Resource Assessment | Not Required |
Project Schedule
| Target Date | Actual Date | |
|---|---|---|
| Project Selection Date | 12/01/2023 | |
| Delayed Project Date | 07/01/2026 | |
| DAHP Assessment Date | ||
| Predesign Approval | ||
| Design Approval | 02/01/2024 | 12/14/2023 |
| Bid Auth. Approval | 05/01/2024 | 06/30/2023 |
| Construction Approval | 05/15/2024 | 06/30/2024 |
| Project Closeout | 10/31/2024 | 02/25/2025 |
| Audit Date | 02/26/2025 | |
| Withdrawn Date |
Project Funding
| TIB Funds | Project Costs | |
|---|---|---|
| Environmental Study | 0 | 0 |
| Design Study | 0 | 0 |
| Total Predesign | 0 | 0 |
| Special Study | 0 | 0 |
| Design | 0 | 0 |
| Right of Way | 0 | 0 |
| Total Design | 0 | 0 |
| Construction Engineering | 0 | 0 |
| Construction Contract | 19,800 | 40,251 |
| Other Construction | 0 | 0 |
| Total Construction | 19,800 | 40,251 |
| Funding Increase | 23,522 | |
| Funding Surplus | - 3,071 | |
| Total TIB Funding | 40,251 | 40,251 |
Local Funding Partners
| Funding Amount | Percent | |
|---|---|---|
| FAIRFIELD | 0 | 0.0% |
| WSDOT Funding | 0 | 0.0% |
| Total Local Funding | 0 | 0.0% |
Project Description
Pavement repair and cracksealing/mastic
Existing Condition
Project Benefits
Project Delays
| Delay Type | Resolution Date | Comments |
|---|---|---|
No delayed project history. |
||