Town of Waterville's 2024 Street Maintenance
2-E-854(005)-1
2-E-854(005)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Construction
Total TIB Funding : $186,175
County: Douglas | Legislative District: 7 | Project Length: 0.00 | TIB Engineer: Andrew Beagle | Last Payment Date: 11/25/2024
Project Information
Lead Agency | WATERVILLE |
Funding Year | 2025 |
Program | SCPP |
Current Phase | Construction |
Legislative District | 7 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Jill Thompson |
Contact Email | watervillemayor@nwi.net |
TIB Engineer | Andrew Beagle |
Last Payment Date | 11/25/2024 |
Cultural Resource Assessment | Not Required |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
DAHP Assessment Date | ||
Predesign Approval | ||
Design Approval | 02/01/2024 | 12/06/2023 |
Bid Auth. Approval | 02/01/2024 | 12/06/2023 |
Construction Approval | 06/24/2024 | 09/09/2024 |
Project Closeout | 11/30/2024 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 5,000 |
Right of Way | 0 | 0 |
Total Design | 0 | 5,000 |
Construction Engineering | 0 | 0 |
Construction Contract | 210,845 | 181,175 |
Other Construction | 0 | 0 |
Total Construction | 210,845 | 181,175 |
Funding Surplus | - 24,670 | |
Total TIB Funding | 186,175 | 186,175 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
WATERVILLE | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Crack sealing and limited asphalt repair throughout town network.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |