City of Sedro Woolley
JonesJohn Liner RR Undercrossing
Reed St to 100ft w/o Sapp Rd
TIB Award Amount
$2,149,055
Region: Northwest   |   Legislative District: 39   |   Length: 0.21 mi. FY 2026 Urban Arterial Program (UAP)

Existing Conditions

The Jones/John Liner/Trail Road Corridor Project is a multi-phased project that will create an alternative east-west route to State Route (SR) 20 relieving congestion and providing capacity to accommodate current and future commercial and industrial growth.

Project Funding

  TIB Funds Local Funds Total Costs
Design 332,395 60,805 393,200
Right of Way 59,175 10,825 70,000
Construction 1,757,485 322,615 2,080,100
Project Totals $2,149,055 $394,245 $2,543,300

Local Match

TIB Participation Local Match Minimum Local Match
84.5% 15.5% 15%

Description of Improvements

The Jones/John Liner Railroad Undercrossing is a new road (1100 feet) across unimproved right of way. It will consist of one 11-foot travel lane in each direction, curb/gutter on both sides, a three-foot buffer strip and ten-foot multi-use path on the north side, five-foot sidewalk on the south side, redesign the drainage ditch and replace with a modern storm system, and install street lighting in key locations.