Region: Southeast | Legislative District: 8 | Length: 0.67 mi. | FY 2026 Urban Arterial Program (UAP) |
![]() |
Existing ConditionsDuportail Street currently is a five-lane urban principal arterial with a center turn lane and bike lanes with thirteen commercial driveway entrances. With increasing traffic volumes and frequent congestion, the current intersections have become prone to crashes and delays, particularly during peak hours. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 192,714 | 269,687 | 462,401 |
Right of Way | 41,677 | 58,323 | 100,000 |
Construction | 1,338,295 | 1,872,825 | 3,211,120 |
Project Totals | $1,572,686 | $2,200,835 | $3,773,521 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
41.7% | 58.3% | 20% |
The proposed solution for Duportail Street involves constructing roundabouts at the intersection of Duportail Street and Kennedy Road and Duportail and Vintner Square Driveway Entrance. Additionally, a median will be built starting at Keene Road and extending to Queensgate Drive, creating a physical barrier to better manage turning movements.