Region: Southeast | Legislative District: 14 | Length: 0.05 mi. | FY 2026 Urban Arterial Program (UAP) |
![]() |
Existing ConditionsNew commercial and residential developments have increased traffic volumes and congestion, putting strain on the intersection. The W. Washington Avenue leg is stop-controlled with the majority of traffic turning left from S. 72nd Avenue onto W. Washington Avenue. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 1,500,000 | 1,000,000 | 2,500,000 |
Project Totals | $1,500,000 | $1,000,000 | $2,500,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
60.0% | 40.0% | 20% |
The project will reconstruct the W. Washington Avenue and S. 72nd Avenue intersection into a single lane roundabout with 20 foot lanes including sidewalk, curb and gutter. A 19-foot truck apron will be constructed to accommodate larger vehicles as this is a freight route with a large presence of agricultural trucks during harvest.