Region: Southwest | Legislative District: 18 | Length: 0.68 mi. | FY 2026 Urban Arterial Program (UAP) |
![]() |
Existing ConditionsThis project will replace the existing single lane all-way stop controlled intersection at NE 179th Street and NE 29th Avenue with a dual lane (single-lane striped) roundabout adding ADA compliant pedestrian and bicycle facilities through the intersection. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 3,000,000 | 15,442,626 | 18,442,626 |
Project Totals | $3,000,000 | $15,442,626 | $18,442,626 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
16.3% | 83.7% | 20% |
This Project will construct a dual lane roundabout adding ADA compliant pedestrian and bicycle facilities through the intersection. The project will improve intersection visibility by installing roadway lighting, and markings including signing, targeted lighting, reflective candle sticks, and RRFBs at pedestrian cross walks.