Clark County
NE 179th St and NE 29th Ave Intersection Improvement
NE 29th Ave Intersection
TIB Award Amount
$3,000,000
Region: Southwest   |   Legislative District: 18   |   Length: 0.68 mi. FY 2026 Urban Arterial Program (UAP)

Existing Conditions

This project will replace the existing single lane all-way stop controlled intersection at NE 179th Street and NE 29th Avenue with a dual lane (single-lane striped) roundabout adding ADA compliant pedestrian and bicycle facilities through the intersection.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 3,000,000 15,442,626 18,442,626
Project Totals $3,000,000 $15,442,626 $18,442,626

Local Match

TIB Participation Local Match Minimum Local Match
16.3% 83.7% 20%

Description of Improvements

This Project will construct a dual lane roundabout adding ADA compliant pedestrian and bicycle facilities through the intersection. The project will improve intersection visibility by installing roadway lighting, and markings including signing, targeted lighting, reflective candle sticks, and RRFBs at pedestrian cross walks.