Town of Rosalia
2025 Overlay
Multiple Locations
TIB Award Amount
$167,315
Region: East   |   Legislative District: 9   |   Length: 0.00 mi. FY 2026 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 20,000 0 20,000
Right of Way 0 0 0
Construction 147,315 0 147,315
Project Totals $167,315 $0 $167,315

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

2" overlay