|
|
||||
Region: East | Legislative District: 14 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 146,430 | 7,707 | 154,137 |
Project Totals | $146,430 | $7,707 | $154,137 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Chip seal