|
|
||||
Region: East | Legislative District: 16 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 42,600 | 2,242 | 44,842 |
Right of Way | 0 | 0 | 0 |
Construction | 511,177 | 26,904 | 538,081 |
Project Totals | $553,777 | $29,146 | $582,923 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |