|
|
||||
Region: Puget Sound | Legislative District: 2 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 64,600 | 3,400 | 68,000 |
Right of Way | 0 | 0 | 0 |
Construction | 468,973 | 24,683 | 493,656 |
Project Totals | $533,573 | $28,083 | $561,656 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Eatonville Highway E - Emerald Ridge Dr to Center St W 2-inch grind and overlay