|
|
||||
Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 23,496 | 0 | 23,496 |
Right of Way | 0 | 0 | 0 |
Construction | 540,420 | 0 | 540,420 |
Project Totals | $563,916 | $0 | $563,916 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Otta Seal with several prep options depending on the segment.