|
|
||||
Region: West | Legislative District: 20 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 58,397 | 3,073 | 61,470 |
Right of Way | 0 | 0 | 0 |
Construction | 447,707 | 23,563 | 471,270 |
Project Totals | $506,103 | $26,637 | $532,740 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
2 inch grind and overlay