City of George
2025 Otta Seal
Multiple Locations
TIB Award Amount
$691,810
Region: East   |   Legislative District: 13   |   Length: 0.00 mi. FY 2026 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 57,660 0 57,660
Right of Way 0 0 0
Construction 634,150 0 634,150
Project Totals $691,810 $0 $691,810

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Single Otta Seal on paved streets. Double Otta Seal on gravel streets.