Region: East | Legislative District: 13 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 57,660 | 0 | 57,660 |
Right of Way | 0 | 0 | 0 |
Construction | 634,150 | 0 | 634,150 |
Project Totals | $691,810 | $0 | $691,810 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Single Otta Seal on paved streets. Double Otta Seal on gravel streets.