|
|
||||
Region: East | Legislative District: 13 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 77,407 | 4,075 | 81,482 |
Project Totals | $77,407 | $4,075 | $81,482 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |