Town of Carbonado
Elk Loop Overlay
9th St NW to 9th St NW
TIB Award Amount
$237,400
Region: Puget Sound   |   Legislative District: 31   |   Length: 0.00 mi. FY 2026 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 23,000 0 23,000
Right of Way 0 0 0
Construction 214,400 0 214,400
Project Totals $237,400 $0 $237,400

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Elk Loop - 9th Street NW to 9th Street NW 2-inch overlay and pavement repair