Region: Puget Sound | Legislative District: 12 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 27,190 | 2,120 | 29,310 |
Right of Way | 0 | 0 | 0 |
Construction | 169,910 | 13,250 | 183,160 |
Project Totals | $197,100 | $15,370 | $212,470 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
92.8% | 7.2% | 5% |
Orchard Avenue - 5th Street to 10th Street 2-inch overlay and edge grind