|
|
||||
Region: East | Legislative District: 14 | Length: 0.00 mi. | FY 2026 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 278,827 | 14,675 | 293,502 |
Project Totals | $278,827 | $14,675 | $293,502 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
2 inch overlay