City of Newport
2025 Chip Seal
Multiple Locations
TIB Award Amount
$174,684
Region: East   |   Legislative District: 7   |   Length: 0.00 mi. FY 2026 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 174,684 9,194 183,878
Project Totals $174,684 $9,194 $183,878

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Full depth recycling where needed with, patching, crack seal and chipseal for preservation. Manhole covers will be repositioned where needed.