Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 30,130 | 0 | 30,130 |
Right of Way | 0 | 0 | 0 |
Construction | 424,474 | 0 | 424,474 |
Project Totals | $454,604 | $0 | $454,604 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Chip seal, patching, striping, vinyl stop bar, vinyl crosswalk. Will include an alternate bid for Otta Seal on the same streets for just the travel lanes (20'). Depending on bids, will determin which treatment to move forward with.