|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 252,037 | 0 | 252,037 |
Project Totals | $252,037 | $0 | $252,037 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Chip seal, sweeping and prepping, traffic control, mobilization, and chip cleanup.