|
|
||||
Region: West | Legislative District: 19 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 65,048 | 3,423 | 68,471 |
Right of Way | 0 | 0 | 0 |
Construction | 498,696 | 26,244 | 524,940 |
Project Totals | $563,744 | $29,667 | $593,411 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
2 inch overlay