City of Raymond
2024 SW Raymond Overlay
Multiple Locations
TIB Award Amount
$563,744
Region: West   |   Legislative District: 19   |   Length: 0.00 mi. FY 2025 Small City Preservation Program (SCPP)

Existing Conditions

Anticipated Project Costs

  TIB Funds Local Funds Total Costs
Design 65,048 3,423 68,471
Right of Way 0 0 0
Construction 498,696 26,244 524,940
Project Totals $563,744 $29,667 $593,411

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

2 inch overlay