|
|
||||
Region: Puget Sound | Legislative District: 30 | Length: 0.00 mi. | FY 2025 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 78,300 | 8,700 | 87,000 |
Right of Way | 0 | 0 | 0 |
Construction | 600,300 | 66,700 | 667,000 |
Project Totals | $678,600 | $75,400 | $754,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Grind and 2-inch overlay with spot pavement repair of Ellingson Road - Pacific Avenue to UPRR with 8 ADA ramps.