Region: East | Legislative District: 12 | Length: 0.00 mi. | FY 2022 Small City Preservation Program (SCPP) |
![]() |
Existing Conditions |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 25,744 | 1,356 | 27,100 |
Right of Way | 0 | 0 | 0 |
Construction | 197,923 | 10,427 | 208,350 |
Project Totals | $223,667 | $11,783 | $235,450 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 0% |
Overlay the existing roadway, with subgrade repair (digouts) where necessary. Recent completed work on Foster Avenue between 14th Ave and 17th Ave showed that the roadway lacks a gravel base and the HMA is less than 2 inches thick, so transition planning to connect to side streets would not provide a suitable base for paving. Instead of transition paving, subgrade repair consisting of 6-inches of crushed surfacing top course and 2-inches of HMA will be provided to connect to side streets.