Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2026 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsThe entire road network in Almira is in need of crack seal treatment, minus a handful of blocks which were recently treated and have been excluded from this application. Wide cracks (an inch or greater) and significant alligator cracking exists in multiple locations. In addition, pot holes and areas of localized damage exist throughout the network. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 240,500 | 0 | 240,500 |
Project Totals | $240,500 | $0 | $240,500 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Minor cracking throughout the network could be effectively treated with crack seal. Mastic is proposed as a treatment for wider cracks. Patching and rehabilitation is proposed to as a method to fix potholes and localized damage.