Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2026 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsMetaline Falls local road network is starting to show top-down load stresses throughout the system. Most distresses are alligatoring leading to some potholing throughout the town. The town has done some temporary repairs. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 192,500 | 0 | 192,500 |
Project Totals | $192,500 | $0 | $192,500 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Pavement repair and/or overlay throughout the network on the asphalt portions only. Additional maintenance solutions may be evaluated and proposed after the 2024-2025 snow season should additional stresses be identified prior to the 2025 construction season.