Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2026 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsTown roads throughout Cusick have cracking distresses |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 122,939 | 0 | 122,939 |
Project Totals | $122,939 | $0 | $122,939 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Town-wide crack seal project to prepare the roads for chip sealing the same in the next 2-4 years.