Region: Puget Sound | Legislative District: 39 | Length: 0.00 mi. | FY 2026 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsSeveral Streets in the City are beginning to show signs (cracks) of needing to be resurfaced soon. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 62,100 | 6,900 | 69,000 |
Project Totals | $62,100 | $6,900 | $69,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Perform a City-wide crack seal project. This work will be the first crack seal phase to crack seal all streets in Granite Falls that have TIB PCRs between 45 and 80.