City of Chewelah
2025 Street Maintenance
Multiple Locations
TIB Award Amount
$64,025
Region: East   |   Legislative District: 7   |   Length: 0.00 mi. FY 2026 Small City Maintenance Program (SCMP)

Existing Conditions

Many roads have sections with spalled pavement or severe rutting that need repair. Alligatored areas exist in some areas along all of the segments.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 64,025 3,370 67,395
Project Totals $64,025 $3,370 $67,395

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Pavement repair, skimcoats, and crack seal by city forces.