|
|
||||
Region: West | Legislative District: 19 | Length: 0.00 mi. | FY 2026 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsThere are several roads in the Town that have cracks that need to be sealed to preserve the roadways and prevent premature failures. |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 166,000 | 0 | 166,000 |
Project Totals | $166,000 | $0 | $166,000 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Crack seal the potential candidate streets of future overlays. Town will investigate using County Forces or Small Works Roster.