Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsThere are several potholes in need of repair throughout the Town. Crack Sealing is needed on many streets to protect against pavement deterioration |
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 32,200 | 0 | 32,200 |
Project Totals | $32,200 | $0 | $32,200 |
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Crack Sealing of cracks 1/4 or widerMastic Repair for wide cracksPavement Repair of potholes and areas where pavement is rapidly deteriorating and blowing out.